News

Fubara throws Wike’s tantrum on Amaechi back to him

Written by silvernewsng

Gov Fubara in warm handshake with Sir Celestine Omehia

• How many projects have you brought home

If one good turn deserved another, it may mean that one bad turn would surely deserve another.
This truism came to the fore in Etche area of Rivers State on Wednesday, December 11, 2024, when one of the popular refrains of the former governor, Nyesom Wike, was thrown back at him.

Gov Sim Fubara was flagging off a road project. He remembered what Wike used to say about his predecessor, and chose to sing back the song, or to throw back the tantrum.

Gov Fubara had pointed out that Rivers State is the most respected state because of the economic lifeline that it provides Nigeria. He however, lamented that it is disheartening to imagine that Rivers sons, in the guise of politics, would de-market the State and destroy its economic strength.

He added, “Many Rivers children who are outside the State are trying to bring Rivers State down. If you de-market your own State, no person will respect your State. There are many people outside Rivers State that are trying to de-market the State. Two, three years ago, Your Excellency, some leaders of the State were saying that Ministers from Rivers State must bring projects to the State. Today, we are asking questions.

“When Rotimi Amaechi was the Minister, people were asking questions to say: what are the projects you have brought? Today, we are asking the same question: how many projects have you brought into Etche? How many projects have we received in Ikwerre Local Government? How many projects have we received in Ikwerre Ethnic Nationality? We are waiting.”

Providing the project description, the State Commissioner for Works, Barrister Elloka Tasie-Amadi, said the Egwi-Afara-Mba Road project is scheduled for completion in nine months, clarifying that his ministry is doing its best by pressuring the contractor to take advantage of the clement weather and deliver the project in six months.

He said, “This road starts from Egwi; passes through Afara; and terminates at Mba in Etche Local Government Area. The road is 12.3 kilometres. We have 9,000 meters of drainage in the populated areas, and the road is 10.3 meters wide, 7.3 of the width is a carriageway, and 3 meters is the shoulder, 1.5 meters on the either side of the road”.

In his welcome address, Executive Chairman of Etche Local Government Area, Mr Uzodinma Nwafor, thanked Governor Fubara for being in Etche land thrice in two weeks to inaugurate, flag-off projects, and also attend Etche first festival of food, culture and art, and assured the total support of the people to the present administration.

On his part, Area Manager of Setraco Nigeria Ltd, the firm handling the project, Engr Michael Issa, said the road project is a vital infrastructure that is 12km long with 100meters connecting roads, accompanied by 8.8km of drainage systems, emphasising their delight and honour in being trusted to play a role in actualising it, just as he pledged to deliver quality road that will last a long time.

$$

About the author

silvernewsng

Leave a Comment